What does a ducted heat-pump project cost in Washington, DC?

Our typical range for a whole-home ducted installation or like-for-like replacement in Washington, DC is $8,000 to $18,000 before rebates; your written estimate after the site visit sets the price. At Perennial DC Heat Pumps we install and replace ducted air-source heat pumps across the city, and that range covers one system with standard materials and normal access.

What our typical range covers

If you’re trying to set a budget before anyone visits, this is what the range includes: one residential whole-home ducted system, with matched indoor and outdoor equipment, installation labor, standard materials and normal access. It is the gross figure, the full amount you pay before any DCSEU reimbursement arrives. It leaves out major duct reconstruction, electrical service upgrades, difficult access or roof work, structural changes, historic-review complications, remediation and unusual distribution.

Component-only work, commercial systems, shared building systems, geothermal and ductless projects sit outside it too, and we price those from the site visit. Our cost estimator uses the same boundary and leaves any item we price on site open rather than inventing a closed total.

Why your price lands where it does

Where your project lands inside the range, or whether it leaves it, comes down to a short list of drivers. None carries a fixed DC surcharge, so the table explains what each one does rather than adding a percentage.

Factor Why it moves your price Where it usually lands
Capacity needed at 14°F ENERGY STAR’s DC heating design temperature sets how much output your house needs on a design day Inside the range; larger or cold-climate models sit higher
Efficiency tier ENERGY STAR Most Efficient equipment costs more and earns a higher DCSEU tier Inside the range
Existing ducts Static pressure and return sizing decide whether your ducts carry the new airflow Minor fixes inside; major ductwork outside
Electrical service Strip backup and new circuits may exceed your panel’s capacity Circuits often inside; a service heavy-up outside
Refrigerant lines Reuse depends on size, length, condition and the new unit’s tables New lines inside on a typical route
Outdoor location and access Rooftop placement, long line routes or a tight stair add labor and lifting Ordinary access inside; roof or crane work outside
Approvals Historic, Georgetown or public-space reviews add time and drawings Standard permits inside; complex reviews outside
Existing fuel A furnace conversion adds gas and flue decommissioning Often at the upper end or beyond

What’s inside a Washington, DC heat pump price

Equipment is only one part of an installed price. Each row below names a part of your price, what sets it, and how we price it or the local figure a public agency publishes for it.

Part of the price What sets it How we price it, or the local figure
Matched equipment Indoor and outdoor models, controls and backup heater for your calculated load Part of our $8,000 to $18,000 typical range; the models are named in your written estimate
Installation labor Hours for removal, setting, piping, wiring and testing BLS: HVAC mechanics and installers earn a mean $35.45 an hour in the Washington metro vs $31.14 nationally, about 14% higher. A wage is not a billing rate: the billed rate also carries insurance, licensing, vehicles and overhead
Mechanical permit Equipment size and permit route DOB: Class E refrigeration (0 to 120,000 BTU/h) $50.60; instant mechanical up to 10 tons $50.60
Electrical permits New circuits or a service change DOB: instant general electrical $22; instant heavy-up $64.90
Duct changes Measured static pressure, returns and access Priced from the site visit, as its own line in your estimate
Electrical service work The load calculation for your panel Priced from the site visit; a heavy-up is its own line
Finish repair Walls, ceilings or floors opened for ducts or lines Priced from the site visit; your estimate says who restores each opening
Rebates (after install) Equipment tier and the fuel you’re replacing DCSEU: $1,000 to $5,000 by tier, each a separate reimbursement, not a discount
Running cost (after install) Your household’s use and utility rates OPC calculator: Pepco customer charge $17.09 a month; winter generation about $0.102 per kWh

The BLS figures come from the Occupational Employment and Wage Statistics metro wage tables and national tables, May 2025 data; medians are $34.58 locally and $29.33 nationally. They explain why labor in DC costs more than the national average; they don’t set your project’s hours or price.

Replacing a heat pump vs. converting from gas

A replacement swaps a heat pump or air conditioner and often keeps the ducts and circuits, so it tends to sit inside the range. A conversion from gas adds capping the gas line, flue work and sometimes an electrical heavy-up, which pushes toward or past the top. A dual-fuel project keeps the furnace and usually avoids a large strip heater, but needs a compatible coil and control.

Our estimate names the equipment we keep and why it is fit to reuse. An indoor-only air-handler job gets its own price from the site visit; dividing the whole-system range does not produce a component price.

Ducts, wiring and access we price separately

Major ductwork changes, electrical service upgrades, roof or crane placement, structural supports, historic-review complications and remediation sit outside our typical range. Their cost depends on your house, so we price them from the site visit rather than adding a set percentage.

Where we know the work is needed, it gets its own line in your written estimate. Where we can’t know until a wall or ceiling is open, we label it as open. In our estimator you can enter an amount you already have in writing, and it leaves the upper total open while any selected work is still to be priced. Our electrical requirements guide explains when a heavy-up comes into play.

Put these questions into a project brief

Describe what you know about the property. Technical unknowns can stay unknown.

Step 1 of 2

Tell us about the project

DOB permit fees for a heat pump project

A heat pump install or replacement needs a DC Department of Buildings mechanical or refrigeration permit, and new circuits or a service upgrade need electrical permits. We file them before work starts. The DOB fee schedule lists these fees:

DOB permit Fee Scope
Class E refrigeration $46 base plus 10% surcharge, $50.60 0 to 120,000 BTU/h
Instant mechanical $50.60 Up to 10 tons
Instant general electrical $22 New circuits within the instant category
Instant electrical heavy-up $64.90 Service upgrade
Historic, public-space or structural review Set by scope HPO, CFA in Georgetown, or a DDOT public space permit as applicable

These are the city’s fees only; our time to prepare and file is part of the price. In a historic district, exterior equipment changes go through Historic Preservation Office review; in Georgetown, visible exterior changes also go to the Commission of Fine Arts. Our historic homes guide covers those routes.

Which rebates apply, and when they arrive

DCSEU’s current residential tiers are reimbursements paid after installation, not discounts at signing, so you fund the gross price first. Each tier is a separate reimbursement for a separate measure.

Program Amount Main condition
DCSEU: ENERGY STAR ducted heat pump replacing electric heat $1,000 Existing heat was electric
DCSEU: ENERGY STAR Most Efficient replacing electric heat $1,500 Most Efficient listing
DCSEU: ENERGY STAR ducted heat pump replacing gas heat $4,000 Proof the fuel system was removed
DCSEU: ENERGY STAR Most Efficient replacing gas heat $5,000 Most Efficient listing and fuel removal
DCSEU: electrical heavy-up Up to $2,000 Service upgrade to 200 amps
DCSEU: new circuits $400 each, up to three Circuits for the electrification measure
DOEE income-qualified electrification Set by the program for each eligible household Household eligibility through DC’s affordable home electrification programs
Federal 25C credit Ended IRS: no credit for property placed in service after December 31, 2025

DCSEU’s heating and cooling page asks for submission within 30 days of installation. Its rules call for a DC-licensed contractor and a DC Master Refrigeration and Air Conditioning mechanic, the DOB mechanical permit, the AHRI certificate, a paid itemized invoice, model and serial numbers and the distributor invoice.

Buildings with up to four units qualify, as can individual condo and co-op units in larger buildings. If you keep the furnace in a dual-fuel system, we don’t count on the conversion tier. Amounts change between program years, so confirm on dcseu.com. The IRS credit page explains the federal end date, and our DC rebates guide walks through the application step by step.

Example budgets

These examples are simple arithmetic from our typical range, the DOB fees and the DCSEU tiers above. Your written estimate sets your real figure, and nothing else is priced here.

Example Gross (before rebate) DOB fees involved Possible reimbursement later
Heat pump replacing an electric heat pump, standard scope $8,000 to $18,000 $50.60 mechanical $1,000, or $1,500 for Most Efficient
Gas furnace removed, standard scope, no service change $8,000 to $18,000 $50.60 mechanical, $22 electrical $4,000, or $5,000 for Most Efficient
Gas furnace removed with a heavy-up and two new circuits $8,000 to $18,000 plus electrical work priced from the site visit $50.60, $22 and $64.90 Tier above, plus up to $2,000 and $800 for circuits
Dual fuel, furnace kept $8,000 to $18,000 $50.60 mechanical, $22 electrical Conversion tier not counted on

In the second example, if the full $4,000 reimbursement is approved, your net outlay after it arrives would be $4,000 to $14,000, but you pay the full gross amount first. In the third, we price the heavy-up from the site visit, so the upper total stays open until your written estimate fills it in.

Running cost is separate: our running-cost guide uses OPC’s calculator components, including the Washington Gas customer charge of $19.05 a month, gas commodity about $0.69 and distribution about $0.73 per therm, and Pepco transmission about $0.018 and distribution about $0.034 per kWh. Riders and taxes are extra, so your own bill is the real input.

Comparing our estimate with others

Our quote checklist lines up models, how each system was sized, supporting work, permits, testing and exclusions side by side. Schedule and payment terms are set in the written estimate itself. Our DC heat pump buying guide explains how to read capacity at 14°F against your load.

For operating costs, compare rates and performance separately from the install price. To request an estimate, tell us your current system, the property type and any access or approval issues you know about, and we’ll turn the range into a price for your address.

Questions before you decide

Does the DC planning range include a complete electrical-service upgrade?

No. A service heavy-up sits outside our $8,000 to $18,000 typical range, and we price it from the site visit as its own line. The DOB heavy-up permit is $64.90, and DCSEU currently reimburses up to $2,000 toward a 200 amp upgrade.

Can the residential band price an air-handler-only job?

No. Our range covers a whole system. An indoor-only job has different equipment, labor and access, so we price it from the site visit and itemize it in your written estimate.

Why can an estimator result have no closed upper total?

Because some work you select, such as a heavy-up or major duct changes, depends on your house, and we price it from the site visit. Leaving the top open is more honest than hiding that work under a precise-looking ceiling.

Get a clear project scope

Describe the existing system and what you want to change. Unknown technical details can remain unknown at inquiry.

Step 1 of 2

Tell us about the project